As-built drawings/contractor mark-ups [1]
Record Description:
Drawings and specifications with contractor mark-ups indicating changes made by contractor during the construction phase. Plans & Drawings are considered confidential records.
Administrative Unit Responsible for Establishing Retention Criteria:
Official Files Maintained By:
Record Category:
UI Retention Guidelines:
Permanent
Confidential:
Yes
Vital:
Yes
Year Updated:
2017